Reznor MASA Unit Installation Manual User Manual
Air cooled condensing unit, Designed for reznor split systems, R-410a refrigerant only

Form I-COND, P/N 220746R6, Page 1
Form I-COND (Version C.2)
Obsoletes I-COND (Version C.1)
Installation/Operation/Maintenance
Applies to:
Model MASA
Air Cooled Condensing Unit
Designed for Reznor Split Systems
This booklet includes operation, maintenance, and service information. Before beginning any procedure, carefully
review the information, paying particular attention to the warnings. All installation procedures including handling of
refrigerant must be in compliance with all codes and requirements of authorities having jurisdiction.
Installer should complete information on page 40.
Condenser Startup Form on page 38 should be completed on initial startup.
Owner should keep this booklet for future reference.
R-410A
Refrigerant
Only
IMPORTANT: Check, Test, and Startup MUST be followed, as documented in this manual.
A completed Condenser Startup Form (page 38) may be required for validation of any warranty
claims.
The factory reserves the right to deny warranty without completed Condenser Startup Form.
AG
EN
CY
PROCE
SS
ST
A
R
T-
U
P
PR
ODUCT
C
U
ST
O
M
ER
WAR
RA
NT
Y
CO
NVERGENT
QU
ALITY SYSTE
M
Q
M
CQS