5.0 Mounting

5.1 Weights

Before installing, check the supporting structure to be sure that it has sufficient

load-bearing capacity to support the operating weight of the unit. Mounting is

the responsibility of the installer.

TABLE 1 - Weights

Approximate Operating Weight of Condensing Unit

MASA Size

060

090

120

150

180

240

lbs

440

461

632

699

749

771

kg

200

209

287

317

340

350

6.0 Mechanical

6.1 Refrigerant Piping

6.1.1 Location of Piping Connections at the Condensing Unit

Remove the control compartment door panel. Locate the refrigerant connec-

tions in the lower right corner. See

FIGURE 3, page 8. Each circuit is shipped

with a nitrogen charge and has a shutoff valve. Do not open the valves until

after the lines are connected and the condenser circuits are leak tested.
The entrances for the two main refrigerant circuits are identified as Circuit A

and Circuit B (See

FIGURE 3). Circuit A is the smaller (approximate 33%) con-

denser circuit; Circuit B is the larger (approximate 67%) circuit. Also indicated,

are the entrances for optional hot gas bypass circuits. If the condensing unit

is equipped with a hot gas bypass on only one circuit (Option CUG2), only

one entrance will be used. If equipped with a hot gas bypass on both circuits

(Option CUG3), both entrances will be used.

When connecting refrigerant

lines to the condensing unit and the air handler, it is very important to

make all connections so that each individual circuit is maintained.

5.2 Lifting

The heavy gauge base of the condensing unit has fork lift holes and a pair of

lifting holes on each corner for rigging. If lifting with a forklift, forks must have

a minimum length of 24” (610mm). If attaching rigging, insert a clevis in each

set of holes for the rigging

and lift using spreader bars. Lift the unit straight

up with vertical force.
Test lift the unit to be sure that it is secure and then lift slowly following safe

lifting procedures. Lifting and rigging are the responsibility of the installer.

5.3 Mounting

Condensing unit may be set directly on a roof or slab. Unit must be level. Be

sure to comply with clearances in

FIGURE 1, page 5.

CAUTION

Do not remove seal caps from refrigerant connections or

open the service valves until ready to make permanent

connection. Exposure to the atmosphere for longer than

five minutes may allow moisture and dirt to contaminate the

system. See Hazard Levels, page 3.