Caution, Warning – Reznor MASA Unit Installation Manual User Manual

Page 32

Advertising
background image

Form I-COND, P/N 220746R6, Page 32

10.5 Compressor

Maintenance

and

Replacement

(cont’d)

10.0 Maintenance

and Service

(cont’d)

b) Install a temporary filter drier in the suction line. When there is acid, a

100% activated alumina suction filter drier is recommended. The suc-

tion line drier should be sized properly for the circuit and have a service

access fitting to monitor pressure drop across the drier. (NOTE: Suction

line filter drier must be removed after 72 hours of operation.)

Step 12 includes the remaining procedures required for cleanup of a

burnout. Continue to

Step 5.

Step 5. Braze on Suction and Discharge Lines

Comply with the brazing instructions in Paragraph 6.1.3.6.

Step 6. Check Circuit for Leaks

Comply with instructions in Paragraph 6.2.1.

Step 7. Evacuate the Circuit

Comply with instructions in Paragraph 6.3.

Continue and/or repeat

Steps 6 and 7 until evacuation is complete.

CAUTION

Do not use the replacement compressor as an evacuation

assist and never apply voltage to a compressor while it is in

a vacuum. See Hazard Levels, page 3.

Moisture and air are harmful to the system because they increase the con-

densing temperature, raise the discharge gas temperature, cause formation

of acids, and cause oil breakdown.

CAUTION

Do not leave a circuit open to the atmosphere any longer than

minimum required for installation. POE oil in the compressor

is extremely susceptible to moisture absorption. Evacuation

will not remove moisture from POE oil. See Hazard Levels,

page 3.

Step 8. Check the Electrical System

After the system has been evacuated, reconnect the electrical plug to the

compressor or the wires to the compressor terminals. It is a normal prac-

tice to replace all starting components any time a compressor is changed.

WARNING

Do not apply voltage to the compressor when the plug is

removed or terminals disconnected. See Hazard Levels, page

3.

Crankcase Heater

Connect the crankcase heater. The crankcase heater is energized continu-

ously and is extremely important to proper compressor operation and long

life.
The crankcase heater must be energized for at least 24 hours before start-

ing the unit or after a power outage of more than 8 hours. Be sure to disable

cooling controls before turning on power to warmup crankcase heaters.

Step 4. Install New Filter Driers (cont’d)

Advertising