Index – Reznor MASA Unit Installation Manual User Manual

Page 39

Advertising
background image

Form I-COND, P/N 220746R6, Page 39

INDEX

A

Acid Test 31

Analog Control System 21

APPENDIX 36

B

Braze 32

Brazing 16

Burnout cleanup 31

C

Charge the System 33

Checklist Prior to Start-up 23

Check System for Leaks 32

Clearances 5

Coil, Cleaning 28

Coil Guard 28

Compressor burnout 31

Compressor Checks 28

Compressor Handling 29

Compressor Protection 22

Replacement Compressors 29, 30

Compressor Wiring 19

Condenser Fan 27

Condensing Unit, Location of Piping

Connections 7

Control Locations 27

Crankcase Heater 22

D

Diagram, Analog Control Connection

Wiring 21

Diagram, Digital Control Connection

Wiring 21

Digital Control System 21

Dimensions 6

Disconnect Switch 18

E

Electrical and Wiring 18

Electrical Information 37

Equalizer Line 15

Evacuate the Circuits 17

Evacuate the System 32

Evaporator Coil, Location of Piping

Connections 8

F

Filter Drier 13, 31

Final Checks and Start-Up 23, 24

H

HAZARD INTENSITY LEVELS 3

High Pressure Cutoff 22

Hot Gas Bypass 22

Hot Gas Bypass Lines 15

Hot Gas Bypass Valve Setting 22

I

Installation Codes 4

INSTALLER MUST COMPLETE 40

L

Leak Test the Condensing Unit 16

Leak Test the Field-Installed Piping 17

Lifting 7

Liquid Line Piping 13

Location 5

Low Pressure Cutoff 22

M

Maintenance Schedule 27

Mounting 7

Mounting grommets 31

Moving 5

O

Oil Charge 31

Operation, Sequence of Cooling 24, 25

P

Piping, Length and Size of Refrigerant

12

Piping, Type and Size of Refrigerant 11,

16

POE Oil 36

R

R410A Refrigerant - IMPORTANT

Reminders 36

Receiving 5

Refrigerant, Pressure/Temperature

Chart for R-410A 37

Refrigerant Charge 16, 17

Refrigerant Piping 7

Refrigerant Piping Connections 8

Refrigerant Piping Guidelines 11

Refrigerant Piping Length 11

Refrigerant Piping on a PreevA Split

System with the Condenser Unit

ABOVE the Evaporator Unit 9

Refrigerant Piping on a PreevA Split

System with the Evapoator Unit

ABOVE the Condenser Unit 10

Rigging 7

S

Shipped-Separate Items 5

Start-up 24

Subcooling 25, 26

Suction Line Piping 15

Superheat 25

Supply Voltage 18

T

Technical Information 36

Thermal Expansion Valve Bulb 15

Thermal Expansion Valve 14

Thermostatic Expansion Valve Equalizer

Line 15

Troubleshooting 34

U

Uncrating 5

V

Voltage Supply, Check 19

W

Warning labels 3

Warranty 4

Weights 7

Wiring, Control 21

Wiring, Supply 18

Wiring Diagram 18, 20

WorkSHEET for calculating the

equivalent length 13

Advertising