Fieldpilot, Disconnect here, Priority valve follow this hose n – TeeJet FieldPilot Install John Deere 4710 & 4720 User Manual
Page 13: Hose from priority valve n m
Advertising

www.teejet.com
14
FieldPilot
®
7. INStAll lOAD SeNSe HOSeS
John Deere 4710
Locate the priority valve on the left side of the machine. Follow the hose indicated in the photograph and
disconnect it from the load sense jam valve and shuttle. Connect this hose to one side of the shuttle tee.
Connect hose
(N)
to the 90° adapter on the top of the shuttle and route it to the open port on the load sense
jam valve and shuttle. Connect hose
(M)
to the other side of the shuttle and route it to the LS port on the
FieldPilot valve.
Figure 1-8: Install Load Sense Hose
disconnect Here
priority Valve
Follow this hose
N
Hose from
priority Valve
N
M
Advertising