Fieldpilot, H, b, j k, G, b, j – TeeJet FieldPilot Install John Deere 9x00-9x20 User Manual

Page 17: Install the fieldpilot valve bracket, Mount the fieldpilot valve

Advertising
background image

13

FieldPilot

®

98-05217 R3

2. install the FieldPilOt ValVe Bracket

Locate the holes on the left side of the rear portion of the tractor as shown. Select the hole shown and mount the

valve bracket

(K)

using bolt

(H)

, washer

(B)

and nut

(J)

.

Figure 1-8: Installing the Mounting Bracket for the FieldPilot Valve

H, B, J

K

3. MOunt the FieldPilOt ValVe

Use bolts

(G)

, washers

(B)

and nuts

(J)

to mount the FieldPilot valve

(C)

to the bracket

(K)

. Mount the valve

with the electronic connections up, the Pressure, Tank and Load sense adapters should be facing the rear of the

tractor and the A and B adapter should be facing the front of the tractor.
Figure 1-9: Mounting the FieldPilot Valve

G, B, J

Advertising