Tie Down Jet Rail XL User Manual

Page 6

Advertising
background image

TIE DOWN ENGINEERING

6

www.tiedown.com

9. Assemble Bow Stop

Attach 4 inch spool rollers to the bow stop using two hex head bolts,
5” x 1/2”, two flat steel washers and two 1/2” nyloc nuts. The washers
are used on top of the rollers. (Picture 12)

Slide the bow stop over the upright winch mount tube, rubber rollers
in the “up” position. Using the holes in the bow stop plate next to the
winch mount tube,place a 4 inch x 3/8” bolt and nyloc nut. Tighten bolt
so that the bow stop is about 12 inches below the top of the tube. You
will adjust this later to fit your watercraft.

Parts required for this step.

#

Stk. #

Description

Qty.

8

26612

Bow Stop

1

23

17052

Spool Rollers, 4”

2

30

10938

1/2” x 5-1/2” Hex Head Bolt

2

33

10645

1/2” Nyloc Nut

2

37

10573

1/2” Flat Washers

2

28

BBB3750400

3/8” x 4” Hex Head Bolt

1

34

10627

3/8” Nyloc Nut

1

10. Attach Winch & Winch Mount to Winch Mount Tube

Attach winch mount to winch using three - 3/8” x 1” hex bolts and
nyloc nuts (picture 13). Attach winch mount & winch, to tube as shown
in picture 14, using two - 3/8” x 4” hex head bolts. (Picture 14)

Parts required for this step.

#

Stk. #

Description

Qty.

13

17135

Winch

1

28

BBB3750400

3/8” x 4” Hex Head Bolt

2

34

10627

3/8” Nyloc Nut

2

7

26611

Winch Mount

1

27

10538

3/8” x 1” Hex Head Bolt

3

34

10627

3/8” Nyloc Nut

3

11. Assemble Winch Handle

9

8

33

23

30

37

See “NOTE” on page 8 for this step

Parts required for this step.

#

Stk. #

Description

Qty.

26

84472Z

1/2” U-bolt

1

33

10645

1/2” Nyloc Nut

2

38

44540

Shackle Plate

1

Picture 12

Picture 13

Picture 14

27

34

7

13

12

Advertising