Tie Down Jet Rail XL User Manual

Page 7

Advertising
background image

Picture 15

Picture 16

Picture 17

TIE DOWN ENGINEERING

7

www.tiedown.com

Attach the winch handle to the winch. Turn clockwise until handle turns
gears. Place spring in handle shaft, followed by the nyloc nut supplied
with the winch. Tighten nut.

12. Attach Winch Strap to Winch

Using a three inch x 1/4” hex head bolt, washer & nyloc nut, attach the
winch strap to the winch as shown in pictures 15 & 16. Wind the winch
strap onto the winch using the winch handle.

Pull length of strap down side of tube, through the bow stop. Use a
3/8” x 4” bolt and the 3” x 3/4” strap roller in the remaining holes in
the bow stop. Winch strap should be between the mounting bolt clos-
est to the winch mount tube and the 3” x 3/4” roller. Picture 17

Parts required for this step.

#

Stk. #

Description

Qty.

12

50460JR

15” Winch Strap

1

16

45251

3” x 3/4” Strap Roller

1

28

BBB37500400

3/8” x 4” Hex Head Bolt

1

34

10627

3/8” Nyloc Nut

1

13

17135

Winch

1

Included above (13)

1/4” x 3” Hex Head Bolt

1

Included above (13)

1/4” Nyloc Nut

1

Included above (13)

1/4” washer

1

NOTE: If your PWC does not have a bow eye and uses a hole in the
front deck, do not thread the winch strap through the bow stop. Use
the strap direct from winch to PWC using the “soft hook” provided. Also
see page 8 of these instructions.

Mount Jet Rail with lag bolts or bolts through the dock floor. Check
for obstructions under the dock before drilling any holes. Rear mount
should be close to edge of dock where you will be hoisting the
Watercraft.

Advertising