Tii 91 Series User Manual

Page 2

Advertising
background image

2b. Unscrew Angle Driver screw to the full
upright position.

2c. Fully insert the two subscriber wires into
their respective tip and ring (color-coded)
ports.

2d. Dress the wires through the strain relief
slots to hold them in place (See Figure 4).

Figure 4

3. Lower Port Telco Connections

(See Figure 5)

3a. Do not strip wire insulation. Make certain
wire ends are cut flush with insulation.

3b. Unscrew Angle Driver screw to full upright
position.

3c. Fully insert the two feeder (telco) wires into
their respective tip and ring (color-coded)
ports.

3d. While holding the two telco wires in place
tighten Drive Screw to full down position.

Figure 5

4. Binding Post Protector Wiring

4a. Strip the insulation from service drop wire
Tip (Green) approx. ½ inch. Loosen the lower
nut of one of the binding posts and wrap the
exposed conductor around the stud. Wire
should be between the two washers of the
lower nut. Tighten the nut to secure the
connection and repeat for the Ring (Red) wire.

4b. Wiring to the customer bridge modules
(from protector) is accomplished in the same
manner with the exception that the
connections are made between the two
washers of the upper nut for the station
protector.

Installation

Installing the Customer Bridge Module

1.

Hold the CBM module with the locking hinge

facing you. (See Figure 2)

2. Insert the CBM module locking hinge into the

Network Interface Device (NID) locking tab
(See Figure 7).

3. Pull back NID retainer (See Figure 7) and slip

CBM front locating fingers (See Figure 6) into
NID locating slot.

Figure 6

Wiring

CBM Wiring (Sealed IDC Connections)

1. Four independent telephone pairs can be

connected to a single CBM module. Customer
has the option of installing a #10 Master lock
in the customer lock hasp (See Figure 2).

2. When terminating the first pair to an IDC

connection, always begin with the bottom
terminating rockers (See Figure 2).

3. When terminating to an IDC connection, do

not strip wire insulation from wires.

CAUTION: TO REDUCE THE RISK OF

PERSONAL INJURY, INSERT A RJ-11 PLUG

INTO THE CUSTOMER TEST JACK PRIOR TO

MAKING ANY WIRING CONNECTIONS

.

4. Dress terminating wires (to protector) over NID

divider (See Figure 7).

5. Insert and terminate TIP (GRN) & RING (RED)

wires into sealed IDC station protector (See
protector installation note for further details).

6. Open customer security cover on CBM

module.

7. Lift all CBM rockers to the open position as

shown (See Figure 2).

8. Dress wires around customer security cover.

9. Hold the customer telephone wires between

thumb and index finger (approx. 1/8”
separation between wires).

NOTE: Wires should be aligned to the corresponding

holes. Green wire to the “T” (GRN) labeled wire guide

and the Red wire to the “R” (RED) labeled wire guide

.

10. Insert wires into wire guides at the same time

until they bottom out.

11. While holding wires in wire guides, terminate

rocker with thumb (lower rocker all the way).

Advertising