Typical installation, Page 2, New frame construction) – Twin City Ceiling / Wall-Mount Ventilators - T Series User Manual

Page 16: Existing frame construction), Horizontal blower discharge), Remove shipping tape from damper

Advertising
background image

MODELS • T900 • T1500

Page 2

TYPICAL INSTALLATION

MOUNTING

(New Frame Construction)

CEILING

JOIST

(24” centers

shown)

12” ROUND

DUCT

GRILLE

MOUNTING

SCREWS

GRILLE

SCREW

Ventilator factory-shipped

in horizontal

discharge position.

MOUNTING BRACKETS

factory-shipped in position

for ½” ceiling material.

MOUNTING

(Existing Frame Construction)

TYPICAL INSTALLATION

WIRING

WIRING

PLATE

WHITE

TO

WHITE

BLACK

TO

BLACK

EDGE

OF HOUSING

120 VAC LINE IN

GROUND TO

WIRING PLATE

GRILLE

SCREW

DUCTING

(Horizontal blower discharge)

ROOF CAP

12” ROUND

ELBOW

12”

ROUND

DUCT

WALL

CAP

IMPORTANT:

Remove shipping tape from damper

Remove the shipping tape from the damper flap and make sure

that damper flap opens and closes freely inside the ductwork. Use

duct tape to make ductwork connections secure and air-tight.

8” X 12”

TO

12” ROUND

TRANSITION

8” X 12” TO

12” ROUND

TRANSITION

12” ROUND DUCT

FINISHED

CEILING

MATERIAL

Ventilator

factory-shipped

in horizontal

discharge

position.

MOUNTING

BRACKETS

factory-shipped

in position for

½” ceiling

material.

8” X 12” TO

12” ROUND

TRANSITION

CEILING

JOIST

(24” centers

shown)

GRILLE

(Install after ceiling is finished.)

GRILLE NUT

(Install into square

holes in housing)

GRILLE NUT

(Install into

square holes

in housing)

Factory-shipped unit installed in new construction.

Factory-shipped unit installed in existing construction.

Two ways to connect ductwork to a factory-shipped unit.

Ventilator can be wired from outside of housing.

Use UL approved connectors to wire per local codes.

Advertising