Typical installation, New frame construction), Existing frame construction) – Twin City Ceiling / Wall-Mount Ventilators - T Series User Manual

Page 8: Horizontal blower discharge), Remove shipping tape from damper, Remove shipping ring from blower inlet

Advertising
background image

MODELS • T100 • T150

T200 • T250 • T300

TYPICAL INSTALLATION

MOUNTING

(New Frame Construction)

CEILING JOIST

(16” centers shown)

ROUND DUCT*

GRILLE

(Install after

ceiling is

finished.)

MOUNTING

SCREW

GRILLE

SCREW

Blower factory-shipped

in horizontal

discharge position.

Mounting brackets

factory-shipped in

position for ½”

ceiling material.

ADDITIONAL

1½” FRAMING

MOUNTING

(Existing Frame Construction)

TYPICAL INSTALLATION

WIRING

WIRING

PLATE

WHITE

TO

WHITE

BLACK

TO

BLACK

TOP / BACK

OF HOUSING

120 VAC LINE IN

GROUND TO

WIRING PLATE

ROUND DUCT*

GRILLE

SCREW

FINISHED

CEILING

MATERIAL

GRILLE

(Polymeric shown)

CEILING JOIST

(16” centers

shown)

2 X 4 FRAMING

(wide side down)

MOUNTING

BRACKETS

(Attached to

opposite sides

of housing &

upside-down,

so housing is

flush with

finished ceiling)

DUCTING

(Horizontal blower discharge)

ROOF CAP

ROUND

ELBOW*

ROUND

DUCT*

WALL

CAP

IMPORTANT:

Remove shipping tape from damper

Remove the shipping tape from the damper flap and make sure

that damper flap opens and closes freely inside the ductwork. Use

duct tape to make ductwork connections secure and air-tight.

Remove shipping ring from blower inlet

Remove the shipping ring from the blower inlet before operating

the ventilator.

* T100 & T150 use 6” round duct.

T200, T250 & T300 use 8” round duct.

* T100 & T150 use 6” round duct.

T200, T250 & T300 use 8” round duct.

Factory-shipped unit installed in new construction.

Ventilator can be wired from outside of housing. Use UL

approved connectors to wire per local codes.

Two ways to connect ductwork to a factory-shipped unit.

Factory-shipped unit installed in existing construction.

Advertising