Carrier 50BA User Manual

Single-package cooling units

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Number One

AirConditbning

M^er

Division of
Carrier Corporation

CaTiier Parkway • Syracuse N Y 13221

Single-Package Cooling Units

SAFETY CONSIDERATIONS

The 50BA,BB Single-Package Cooling Units are

designed to provide safe and reliable service when
operated within design specifications. However, due
to system pressures, electrical components and
equipment location, some aspects of installation,

start-up and servicing of this equipment can be
hazardous.

Only trained, qualified installers and service

mechanics should install, start up and service this
equipment.

When working on the equipment, observe all pre­

cautions on tags or labels attached to the unit,
safety notes in the literature and any other safety

precautions that apply.

• Follow all safety codes.
• Wear safety glasses and work gloves.
• Use care in handling, rigging and placing bulky

equipment.

A

DANGER

NEVER reach into unit while fan is running.

LOCK OPEN AND TAG fan motor power dis­
connect before working on a fan. Remove the fuses
and take them with you after noting this on tag.

A

WARNING

CHECK assembly and component weights to be
sure rigging equipment can handle them safely. Note
also any specific rigging instructions.

WHEN STEAM CLEANING COILS, be sure area

is clear of personnel.

CONTENTS

Page

SAFETY CONSIDERATIONS.................................... 1
INSTALLATION .......................................................

1-18

General ...................................................................... 1
Step

1 — Receive and inspect unit................... I

Step

2 — Protect units from damage............... 1

Step

3 — Provide unit support.......................... 4

Step

4 — Rig and place unit.............................. 4

Step

5 — Install accessory plenum,

if supplied.......................................

7

Step

6 — Position fan section as desired.

..

7,8

Step

7 — Install fan motor..................................

9

Step

8 — Align fan shaft and wheel.......... 10,11

Step

9 — Install heating coil, if supplied.

.. 11

Step 10 — Install supply air (evaporator)

ductwork........................................ 11

Step 15
Step 16
START-UP...............................................

Unit Size 50BA,BB004 and 006 ...
Unit Size 50BA,BB008 thru 064 ...
Service Valves........................................
Capacity Control Valve Adjustment
SERVICE.................................................
Indoor Air Fan Adjustment

Page

Step 11 — Install return air ductwork

(004-012 units).................................... II

Step 12 — Check return-air filters....................... 11
Step 13 — Check compressor spring

mounts.............................................. 11

Step 14 — Make condenser

connections.....................................11,14

Install unit drain line........................ 15
Make electrical connections. ... 16-18

......... 18
......... 18
......... 18
......... 18
......... 18
......... 19
......... 19

Lubrication............................................................. 20

Return-Air Filters................................................... 20

Condensate Drains ................................................. 20

Evaporator Coil...................................................... 20

Water-Cooled Condenser...................................... 20
Air-Cooled Condenser........................................... 20

Charging the System.......................................... 20,21

Return-Air Grille Removal ..................................... 21

Access Panel Removal.......................................... 22

Indoor-Air Fan Motor Removal............................. 22
Pressure Relief Devices........................................ 22
Crankcase Heaters................................................ 22
High and Low Pressurestats................................ 22

Time Guard® Control Circuit................................ 22

INSTALLATION

General

— The 50BA,BB004 thru 024 units are self-

contained units arranged for vertical air discharge
and wired and piped at the factory.

Size 50BA,BB028 thru 064 units are self-

contained units consisting of a base section, fan
section, fan motor and fan drive package, each
shipped separately and field assembled. The base

section consists of factory-wired compressor/
evaporator coil unit. The fan section can be
mounted for vertical or horizontal air discharge
(Fig. 1).

^Step 1 — Receive and inspect unit.

Check unit against shipping order. Inspect care­

fully for concealed shipping damage. If shipment is

damaged or incomplete, file claim with transporta­
tion company and advise Carrier immediately.

>■

Step 2 — Protect units from damage.

To maintain warranty, protect unit against ad­

verse weather, theft or vandalism on jobsite.

Carrier Corporation 1981

Advertising