Carrier 17CB User Manual

Page 2

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

CONTENTS

Page

SAFETY CONSIDERATIONS

1

INTRODUCTION

2

General

2

Job Data Required

2

Equipment Required

2

INITIAL PREPARATION

4

Machine Tightness

4

Check for Large Leaks

4

Check for Small Leaks

4

Check Leakage Rate

5

Machine Dehydration

5

Pumpout Procedures

5

Recheck Alignment

6

Check Grouting

6

Inspect Piping

6

Field Wiring

6

Lubrication

6

Refrigerant Charge

6

Drive

7

Purge

7

Air Supply (Pneumatic Control Only)

7

Check Safety Control Operation

(Electric Motor Drive)

7

Check Safety Control Operation

(Gas or Turbine Drive)

8

START-UP

10

Preliminary Checks

10

Compressor Rotation and Operation

10

Checking Safety Control Settings

10

Setting Operating Controls — Electronic

12

Setting Operating Controls — Pneumatic

13

Trimming Refrigerant Charge

14

Hot Alignment Check

14

Doweling

15

INSTRUCTING THE CUSTOMER

OPERATOR

15

INTRODUCTION

General

— All persons involved in start-up and

operation of the 17CB machine should be familiar
with these instructions and all necessary job data
before initial start-up. Instructions are arranged in

the

proper

sequence

for

machine

start-up.

MACHINES WITH SPECIAL COMPONENTS
AND/OR CONTROLS MAY REQUIRE SPECIAL

START-UP PROCEDURES OR ADJUSTMENTS.

C H E C K

Y O U R

I N D I V I D U A L

J O B

REQUIREMENTS.

Job Data Required

1. List of applicable design temperatures and

pressures

2. Machine assembly, wiring and piping prints
3. Prints and instructions for special controls
4. 17CB Installation Instructions
5. 17CB Operating and Maintenance Instructions
6. Manufacturer’s Installation and Start-Up In­

structions for:
a. Drive
b. Gear (if applicable)

7. 5F,H Installation Instructions (Refrigerant 114

machines only)

Equipment Required

1. Mechanic’s tools

2. Volt-ohmmeter and clamp-on ammeter

3. Manometer, absolute pressure type
4. Leak detector, halide or electronic
5. Refrigerant drum charging valve (Fig. 5)
6. 5/8-in. SAE X 3/4-in. MPT adapter
7. Five to 10 ft of copper tubing or plastic hose to

fit 5/8-in. SAE connections

8. Portable vacuum pump, 5 to 7.5 cfm or larger