Sears 270-3250 User Manual

Page 11

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Chute Rotation Handle

To attach the chute rotation handle:

1. Remove the handle grip from the handle by removing the screw at the end (see

figure 4).

2. Slide the end of the chute rotation handle, with the grip removed, through the eye

hole on the snow thrower handle as shown in figure 4 a.

3. Slide the other end of the chute rotation handle through the hole near the base of

the chute. Line the spiral of the handle up with the grooves in the base of the
chute (see figure 4b)..

4. Insert the fastener pin through the end of the chute rotation handle near the chute.

Bend the ends of the pin to hold the pin in place.

5. Reattach the grip to the chute rotation handle.

em:

MOtE

CMWrm ;R0«T10li

Figure 4- Chute Rotation Handle Assembly

Drive Control and Auger Control Cable Assembly

The cables that control the drive and auger are already attached to the snow thrower. To
connect them to their respective handles:

1. Attach the cable hooks to the holes on the inner portion of the drive control and

auger control handles as shown in figure 5 a. The hook should dangle freely from
the handles.

2. Connect the drive control and auger control cables to the cable hooks using the

attached turnbuckles (see figure 5b). Rotate the turnbuckles to tighten. The
cables should be just barely taut when the drive and auger control handles are in
the raised position.

11

Advertising