Assembly step 2, Fasten the rail to the motor unit, Assembly step 3 – Sears 139.53930D User Manual

Page 9: Install the idler pulley, Caution

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

ASSEMBLY STEP 2

Fasten the Rail to the Motor Unit

Insert a 1/4"-20x1-3/4 bolt into the cover protection bolt

hole on the back end of the rail as shown. Tighten
securely with a 1/4"-20 lock nut. Do NOT overtighten.

Remove the two bolts from the top of the motor unit.

• Place the “U” bracket, flat side down onto the motor unit

and align the bracket hole with the bolt holes. Fasten
with the previously removed bolts.

• Align the rail assembly with the top of the motor unit.

Slide the rail end onto the “U” bracket, all the way to the
stops that protrude on the top and sides of the bracket.

• Attach spreader to the motor unit with two screws.

CAUTION

To avoid SERIOUS damage to garage door opener, use ONLY
those bolts/fasteners mounted in the top of the opener.

ASSEMBLY STEP 3

Install the Idler Pulley

• Lay the chain/cable beside the rail, as shown. Grasp the

end of the cable and pass approximately 12" (30 cm) of
cable through the window. Allow it to hang until
Assembly Step 5.

• Remove the tape from the idler pulley. The inside center

should be pre-greased. If dry, regrease to ensure proper
operation.

• Place the idler pulley into the window as shown.

• Insert the idler bolt from the top through the rail and

pulley. Tighten with a 3/8" lock washer and nut
underneath the rail until the lock washer is compressed.

• Rotate the pulley to be sure it spins freely.

• Insert a 1/4"-20x1-3/4 bolt into the trolley stop hole in

the front of the rail as shown. Tighten securely with a

1/4"-20 lock nut.

Advertising