Operation – MTD 248-650-000 User Manual

Page 6

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

ATTACHING THE CATCHER BAG

Your unit is equipped with a nylon bag which attaches

to the discharge opening. If desired, place the end of
the bag over the chute deflector. Depress plunger, pull

on the drawstring, and release plunger to lock it in

■ position. See figure 6.

OPERATION

GAS AND OIL FILL UP

NOTE

ENGINE IS SHIPPED WITHOUT OIL. FILL
CRANKCASE WITH OIL BEFORE STAR­

TING.

Service engine with gasoline and oil as instruct id in
the separate engine manual packed with your shred­
der. Read instructions carefully.

TO START ENGINE

1. Attach spark plug wire to spark plug.

2. Place choke lever on engine in CHOKE posh ion.

See figure 7 or 7A.

NOTE

A warm engine may not require
choking.

3. Place the throttle control lever on engine in F \ST

position.

Throttle Control

Lever in Start

Position

Choke

Lever

Tecumseh Engine

5.

7.

FIGURE

7. -

Briggs and

Stratton Engine

Grasp starter handle (see figure 8) and pull rope
out slowly until engine reaches start of compres­
sion cycle (rope will pull slightly harder at this
point). Let the rope rewind slowly.

NOTE

A noise will be heard when finding

the start of the compression cycle. This
noise is caused by the flails and fingers
which are part of the shredding
mechanism falling into place, and
should be expected.

Pull rope with a rapid, continuous, full arm stroke.

Keep a firm grip on start handle. Let rope rewind
slowly. Do not let starter handle snap back

against starter.

Repeat preceding instructions 4 and 5 until
engine fires.

After engine starts, move throttle control lever on

engine to slow position for a few minutes warm
up. Move choke lever gradually to RUN position.
Then move throttle control lever to FAST posi­
tion for shredding operations.

Advertising
This manual is related to the following products: