Unpacking, Note, Other materials required for assembly – MTD Duerr 248-623-003 User Manual

Page 5: Installation of wheels, Assembly

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

This unit has been shipped without
gasoline or oil in the engine. After
assembly, refer to separate engine
manual for proper fuel and engine oil
information.

IMPORTANT

ASSEMBLY

UNPACKING
Remove all parts from the carton. Make certain all
parts and literature have been removed from the

carton before the carton is discarded.

Reservoir Tank

Assembly

Wheels

Wedge and Beam Assembly

__________ J

l

_______

Tongue Assembly

\

Pivot

Latch

Hydraulic

Filter
Head

\

Hydraulic-

Filter

Engine and

Pump Assembly

Assembly

Hoses

Cylinder and

Valve Assembly

Stripper

Assembly

FIGURE 1

FIGURE 2

Hub Cap

NOTE

All hardware for assembly of the log
splitter has been placed in position on
the various parts.

Other Materials Required for Assembly:
Wheel Bearing Grease
Loc-tite Hydraulic Sealer or Equivalent
Engine Oil
Unleaded Gasoline (regular grade gasoline is an

acceptable substitute)

Approximately 6-1/2 Gallons of 10 Weight AW type

fluid or Dexron 11 Automatic Transmission Fluid

Loose Parts in Carton: (See figure 1)

(1) Reservoir Tank Assembly
(2) Wheels
(1) Wedge and Beam Assembly
(1) Tongue Assembly
(1) Pivot Latch
(1) Hitch Assembly
(1) Engine and Pump Assembly
(3) Hoses (taped together)
(1) Cylinder and Valve Assembly
(1) Stripper Assembly (two halves)
(2) Fenders (Not Shown —Model 424/LCD/20)

(1) Filter Head^
(1) Hydraulic Filter*

*May be already assembled to the reservoir tank.

INSTALLATION OF WHEELS
Attach the wheels to the reservoir tank as follows.
See figure 2.

1.

Pry off the hub caps which are attached to the

wheels. Remove one tapered roller bearing from

inside each wheel. See inset, figure 2.

2.

Remove the cotter pin, hex slotted nut and one

flat washer from each axle (leave spacers and
two flat washers in place on axles).

3.

Place one wheel on each axle, with the valve

stem facing outward.

4.

Pack the tapered roller bearings with wheel
bearing grease, and place one on each axle.

5.

Place one flat washer removed in step 2 on each
axle. Secure with hex slotted nut. Tighten
slotted nut until snug, then back off approx­

imately 1/3 turn or until one of the slots on the

slotted nut lines up with the hole in the axle.

6.

Check the assembly of the wheels. There should

be no side to side play, and the wheels should

spin freely.

7.

Place hub caps in position on wheels and tap
on with a rubber mallet or plastic hammer.

Advertising
This manual is related to the following products: