Installation, Continued – Desa CLD3018PT User Manual

Page 13

Advertising
background image

107068-01H

For more information, visit www.desatech.com

For more information, visit www.desatech.com

13

13

INSTALLATION

Checking Gas Connections (Cont.)

Installing Logs, Models CGS2718P, CGS2718N, CGS3124P,

CGS3124N, SGS3124P and SGS3124N

INSTALLATION

Continued

Pressure Testing Heater Gas Connections

1.

Open equipment shutoff valve (see Figure 15).

2.

Open main gas valve located on or near gas meter for natural
gas or open propane/LP supply tank valve.

3.

Make sure control knob of heater is in the OFF position.

4.

Check all joints from gas meter (natural gas) or propane/LP
supply to equipment shutoff valve (see Figure 16 or 17). Ap-
ply a commercial leak detection solution to all joints. Bubbles
forming show a leak.

5.

Correct all leaks at once.

6.

Light heater (see Operating Heater, pages 15 through 17 [manu-
ally-controlled models] or pages 17 and 18 [thermostatically-
controlled models]). Check all other internal joints for leaks.

7.

Turn off heater (see To Turn Off Gas to Appliance, page 17
[manually-controlled models] or page 18 [thermostatically-
controlled models]).

Figure 15 - Equipment Shutoff Valve

Figure 17 - Checking Gas Joints (Propane/LP Gas Only)

ON

POSITION

OFF

POSITION

Open

Closed

Equipment
Shutoff
Valve

Equipment Shutoff Valve

Propane/LP
Supply Tank

Control
Valve
Location

Figure 16 - Checking Gas Joints (Natural Gas Only)

Gas
Meter

Equipment Shutoff Valve

Control
Valve
Location

WARNING: Failure to position the parts in accor-

dance with these diagrams or failure to use only parts
specifically approved with this heater may result in
property damage or personal injury.

Each log is marked with a number. These numbers will help you
identify the log when installing. It is very important to install these
logs exactly as instructed. Do not modify logs. Only use logs
supplied with heater.

1.

Locate pegs on the bottom of back log (#1). Slide these pegs into
the holes in the grate base behind the burner (see Figure 18).

INSTALLING LOGS, MODELS CGS2718P,
CGS2718N, CGS3124P, CGS3124N,
SGS3124P AND SGS3124N

CAUTION: After installation and periodically there-

after, check to ensure that no flame comes in contact
with any log. With the heater set to High, check to see
if flames contact any log. If so, reposition logs ac-
cording to the log installation instructions in this
manual. Flames contacting logs will create soot.

Figure 18 - Installing Back Log

Back Log (#1)

Peg

Peg

Hole

Advertising
This manual is related to the following products: