Da-Lite Motorized Scenic Roller User Manual

Page 3

Advertising
background image

3

Before proceeding with the installation please read the installation and operating instructions thoroughly. Make sure
to recheck measurements of screen and hanger locations before installation. Area must be clear for screen to operate.

With all lid sections removed from shipping container, remove the screws holding the frame to the shipping container
(2 per cross brace). The screen can now be carefully lifted out of the container.

Method A
The frame can be mounted to ceiling with 5/16" diameter
threaded rods. Level frame from front to back and left to right.
Mount from all cross braces (Figure 1).

Method B
Hang from a pipe (fly the screen). Level frame from front to
back and left to right. Mount from all cross braces (Figure. 2).

NOTE: Motor pulley must clear pipe. Chains must clear
motor tubes.

Screen motors have been internally wired at Da-Lite. Wiring
designated “external” is completed by installer conforming to
local and national codes. Refer to wiring diagram on next page.

Check for satisfactory condition by operating the screen. Be
prepared to stop screen. Standard Duty Cycle:
1 MIN. 30 SEC. ON / 45 MIN. OFF.

CAUTION! Excessive continuous operation may cause
overheating and motors will shut off.
Let motors cool 10 to 15 minutes and continue test.

ATTENTION! Le fonctionnement continu et excessif peut
provoquer une surchauffe et l'arrêt du moteur. Laissez le
moteur refroidir pendant 10 à 15 minutes et poursuivez le
test.

Check the cables to make sure they are winding on the motor
and roller pulleys properly.

1. With screen in complete unrolled position, examine the

screen surface carefully. If fabric does not hang flat, loosen
the nuts on the eyebolts of the black clamps. Adjust the
wingnuts to pull or relax the fabric as needed. Several clamp
heights may be adjusted depending on the severity of the
hang. After adjustment, tighten the nuts against the
underside of the frame. Caution stage hands and others to
check area before lowering screen. Do not bump screen with
ladders, scenery, etc.

Installation

Electrical Installation

Screen Adjustment

Figure 1

Figure 2

Suggested Method Of Installation

Method A – Secure To Ceiling

Suggested Method Of Installation

Method B – “Flying Pipe”

Ceiling

Secure To Suit

Front

5/16" Threaded Rod
(6 Cross Braces)
(Not Furnished)

Safety Switch Trigger

Back

Cross

Brace

Secure To

Suit

Cable

15"

Ceiling

Pipe To Suit

Front

Chain To Suit
(6 Cross Braces)
(Not Furnished)

Eye Bolts For Leveling
(Not Furnished)

Safety Switch
Trigger

Back

Cross

Brace

Advertising
This manual is related to the following products: