Procedure – Da-Lite Fast-Fold Deluxe Screen System User Manual

Page 2

Advertising
background image

2

Da-Lite Fast-Fold® Deluxe frames are made of 1-1/4” square hard aluminum tubing with an anodized finish. With proper care they will
provide many years of use. Please follow the set up instructions below (steps 1-6).

1. Remove the frame from its case and wrapping. Position it as shown (front view).

2. Unfold the frame following the directions given below so that it is lying flat, snap latches will automatically lock.

Procedure

Two Section Frame

Three Section Frame

Looking From The Top

Rotate 90

o

Top

Advertising