10. Hang the plasma unit on the Zee-Bars making sure the top and

bottom notches on each Hanging Bracket are placed over the
upper and lower Zee-Bars. See Figure 5.

11. Slide the Security Bar through the slots in the Hanging Brackets,

bolt one end to the Zee-Bar then secure the opposite end with
the pad lock. See Figure 5 & 6.

12. Install Power Supply. See Figure 7.

13. Plug electrical cord into power supply.

14. Connect power plug into power jack on the side of the

electrical housing.

15. A remote control is included in the carton of the power supply.

Use the remote control or rocker switch on the side of the
electrical housing to operate the tilt as needed.

16. The small red button on the remote is for “stop” but is not

needed. The confidence monitor will stop with the release of
either the “up” or “down” button. See Figure 8. The rocker switch
will operate the confidence monitor in the same manner.

17. Install tube enclosures. See Figure 9.

Figure 5

Plasma
(Not Included)

See
Fig.6

J

Security Bar

Zee Bar

X

C

Y

Figure 6

E

Figure 7

Figure 8

Figure 9

B

D

18. Install fasteners into top of Columns for theft deterrent.