Inner frame & viewing surface assembly – Da-Lite UTB Contour User Manual

Page 3

Advertising
background image

3

1. Create a clean work area for assembly using a soft clean material.

This will protect the inner frame and ensure a clean projection
surface.

2. Unwrap frame pieces. Assemble inner frame pieces on the work

area.

3. Slide inner frame pieces together at corners. Secure inner frame

pieces with (12) #10 x 3/8" silver screws (Figure 1).

4. Set the assembled inner frame aside. Unroll screen surface and

place it viewing side down on the clean work area.

5. Place inner frame on screen surface, screw side up.

Inner Frame & Viewing Surface Assembly

Figure 1

(12) #10 x 3/8" Screws.
Silver, Flat Tip

6. Wrap fabric around inner frame and hook grommets over the

corner pins (Figure 2).

7. Hook the rest of the grommets over the flat head screws on all

sides (Figure 2). Please be sure the grommets clear the head of
each screw.

Note: Your screen was assembled and aligned prior to shipment.

If any realignment is necessary, the positioning of the flat head
screws can be adjusted. Using a Phillips screwdriver, rotate the
flat head screw one turn counterclockwise. Reposition screw as
needed. Secure the screw in place by slowly rotating it clockwise.

Grommets

Corner
Pin

Flat Head
Screw

Figure 2

Grommet is under
the Flat Head Screw

Advertising
This manual is related to the following products: