Da-Lite UTB Contour User Manual

Page 6

Advertising
background image

6

1. Secure the large top wall bracket to wall studs at the desired

height. Make sure the bracket is level. The top of the screen will
be 2–1/4" above the top of the edge of this wall bracket when
mounted. You will need at least a 3" clearance above the bracket
to hang the screen (Figure 8).

2. To install the small bottom wall bracket, you must measure the

overall height of the screen and subtract 3". Find the center point
of the top wall bracket. Using your screen height minus 3”,
measure down from the top edge of the top wall bracket and
mark the wall. This will be the center point of the bottom edge of
the bottom wall bracket. Level the bottom wall bracket and mark
the wall for the two screw holes in this bracket (Figure 8).

Installation of Screens Under 104" in Viewing Width

Figure 8 — Screens Under 104" in Viewing Width

Fillister Screw

Large Wall Bracket

Large Wall Bracket

Wall

Small Bottom
Wall Bracket

Small Bottom
Wall Bracket

Small Bottom
Wall Bracket

Screws Not Provided

Overall Height

of Screen Less 3"

Overall Height

of Screen

3. Attach the bottom wall bracket to the wall.

4. Lift the screen at least 3" over the top wall bracket. Lower the

screen until the frame hooks onto the top wall bracket.

5. To secure your screen against wall, locate the fillister screw in the

bottom frame bracket. Tighten the screw until it touches the
bottom wall bracket, then rotate two more turns (Figure 8).

Note: This screw can be rotated up to three more turns if
stretching of viewing surface is needed.

Advertising
This manual is related to the following products: