Cable management – Da-Lite IDEA Interactive Cart User Manual

Page 9

Advertising
background image

Installation Instructions

22516

9

Cable Management

On Side Columns (Monitor Arm Accessory)

1.

Slide two #10-24 square nuts (V) into side columns (H) prior
to attaching column extenders (J and K).

2.

Install two #10-24 x 3/8" Phillips pan machine screws (BB)
through two cable clips (P) and into #10-24 square nuts (V).
(See Figure 11)

Figure 11

3.

Route cables through cable clips and use cable ties (CC) to
secure cables along side column. (See Figure 12)

Figure 12

From Projector

4.

Use two 1/4-20 x 3/8" Phillips pan machine screws (AA) to
secure two cable clips (P) along base of cross bar
assembly. (See Figure 13)

Figure 13

5.

(Optional) Route cables from projector through boom arm
channel down to cross bar assembly base. (See Figure 14)

6.

Route cables through cable clips and use cable ties (Q) to
secure cables along cross bar assembly base. (See
Figure 14)

Figure 14

(V) x 2

(P) x 2

(BB) x 2

2

1

cable (example)

(CC) x 2

(P) x 2

(AA) x 2

4

5

6

6

cable (example)

(CC) x 2

Advertising