JT60/JT60 All Terrain Operator’s Manual

Systems and Equipment - 151

Pipe Boxes

7.

Load a pipe in auxiliary pipe loaders and rest it against pipe stop.

8.

Move at least 10’ away from the machine.

9.

Move auxiliary pipe loaders under row 4 (row 3 if using AT pipe).

10. Raise pipe into row 4.

11. Move shuttles all the way out.

12. Repeat steps 8-12 to load more pieces of pipe into row 4.

13. Move pipe to pipeloader grippers.

•

Raise last pipe into row 4.

•

Move shuttles out.

•

Lower pipe into front grippers.

14. Before operating pipeloader:

•

Close both auxiliary pipe loaders.

•

Remove pipe stop and store it on drill frame.

•

Step away from drilling unit.

Crushing weight. If load falls or moves it could kill or crush you. Use

proper procedures and equipment or stay away.

To help avoid injury:

•

have enough people on hand to manually add or remove single pipe to pipe box.

•

move 10’ away from machine after pipe is placed in auxiliary pipe loaders.