Jt60/jt60 all terrain operator’s manual – Ditch Witch JT60AT User Manual

Page 69

Advertising
background image

JT60/JT60 All Terrain Operator’s Manual

Prepare - 69

Plan Bore Path

JT60 Power Pipe drill pipes have a tested minimum
bend radius of 170’ (57.8 m). This means that a 90-
degree bend in the bore path:

•

has a radius (A) of 170’ (57.8 m)

•

requires approximately 267’ (81.4 m) of drill pipe (B).

JT60 Power Pipe Forged drill pipes have a tested
minimum bend radius of 168.7’ (51.4 m). This means that
a 90-degree bend in the bore path:

•

has a radius (A) of 168.7’ (51.4 m)

•

requires approximately 265’ (80.8 m) of drill pipe (B).

NOTICE: Bending drill pipe more sharply than recommended will damage the pipe and cause failure
over time.

•

If bend radius is reduced, drill pipe life is reduced.

•

If bend radius is increased, drill pipe life is increased.

IMPORTANT: Use the charts on the next page to keep bends within safe limits.

A

A

C

B

B

j40om065w.eps

1

13

24

Advertising
This manual is related to the following products: