Drilling fluid requirements, Mr90 operator’s manual – Ditch Witch MR90 User Manual

Page 65

Advertising
background image

Systems and Equipment - 64

MR90 Operator’s Manual

Drilling Fluid Requirements

CMW

®

Drilling Fluid Requirements

1.

Determine drilling conditions and choose appropriate drilling fluid mix.

2.

Estimate amount of supplies needed and check availability.

•

Drilling fluid

•

Water supply. If more water than can be carried with the unit will be needed, arrange to transport
additional water.

•

Bentonite and/or polymer

3.

Check water quality.

•

Use meter or pH test strips to test pH of water. If pH is below 9.0, add 1 lb (454 g) soda ash per
tank. Test and repeat until pH is between 9 and 10.

•

Check water hardness using hardness test strips. Treat with soda ash if hardness exceeds 125
ppm.

Advertising