Important, Caution, Unpacking and assembly – EarthQuake 26750 User Manual

Page 8

Advertising
background image

Check for parts online at

www.getearthquake.com or call 800-345-6007 M-F 8-5

8

Operator's Manual

VECTOR Compact Tiller

IMPORTANT

THE RIGHT AND LEFT SIDES OF YOUR RO-

TOTILLER ARE DETERMINED FROM THE

OPERATING POSITION AS YOU FACE THE

DIRECTION OF FORWARD TRAVEL.
ENGINE IS SHIPPED FROM FACTORY WITH-

OUT OIL. YOU MUST ADD ENGINE OIL BE-

FORE STARTING ENGINE.

UNPACKING AND ASSEMBLY

UNPACKING AND ASSEMBLING YOUR TILLER

1. Open top of carton and remove handlebar assembly.
2. Parts bag for VECTOR tiller contains:
2- Bolts M8 x 1.25 x 20 Hex Head
6- Bolts M8 x 1.25 x 25 Hex Head
6- Washers M8 8.4mm x 24mm x 2.2mm
6- Nuts M8 x 1.25
2- Middle Handlebar Straps
2- Hand Knobs
6- Bolts M6 x 1.0 x 12
6- Nylock Nuts M6 x 1.0
3. Remove machine from carton
4. Assemble the upper handlebar onto the lower handlebar

loop. Use the two (2) middle handlebar straps to connect the

upper handlebar to the lower handlebar loop. Put the M8 x

25 bolts through the six lower bolt holes from the outside in.

Put on six (6) washers and tighten with six (6) M8 nuts on the

six (6) bolts. Tighten the two (2) M8 hand knobs on the two

(2) M8 x 20 bolts in the upper most hole on each side of the

handlebar. (SEE FIGURES 1 AND 2) The two (2) upper bolts

and hand knobs can be used in one of three hole positions

for handlebar height adjustability. SEE FIGURE 3

CAUTION

DO NOT TRY TO LIFT THE ROTOTILLER FROM THE

CARTON.

FIGURE 1

FIGURE 2

FIGURE 3

Highest Position

Lowest Position

Middle Position

M8 x 25 bolts

lower handlebar loop

M8 nuts

washers

upper handlebar

handlebar strap

lower

handlebar loop

M8 hand

knobs

M8 x 25 bolts

L

R

M8 x 20 bolts

Advertising