EarthQuake 26750 User Manual

Page 9

Advertising
background image

Check for parts online at

www.getearthquake.com or call 800-345-6007 M-F 8-5

9

Operator's Manual

VECTOR Compact Tiller

5. Assemble tine shield extensions using six (6) M6 bolts and six

(6) nylock nuts. SEE FIGURE 4

6. Assemble tines to unit. Sharp edges of tines will be away

from the operator at the top or facedown at front of machine.

Fasten outer tines to the inner tines using the 8mm x 40mm

lock pins already affixed to the inner tines. Lock pins must be

installed so that the pin enters the hole in the tine from the

front of the tiller, and so the wire bale hinges over the top of

the tine pipe and latches to the protruding pin on the back

side of the tine. SEE FIGURE 5

7. Install the drag stake assembly from the top down through the

drag stake holder tube on the tiller frame between the wheels.

Lock the drag stake in place using the lock pin that is already

affixed to the drag stake holder tube. SEE FIGURE 6

FILL ENGINE CRANKCASE

1. Add oil according to engine manual. Do not overfill. Use

a clean, high quality detergent oil. Container must be

marked A.P.I. Service SF - SJ. Use no special additives with

recommended oils. Do not mix oil with gasoline. Oil level

must be full. Check the oil level by removing oil fill plug. Oil

level should be up to the bottom of the fill plug opening.

2. Always check oil level before starting engine. Refer to engine

manual for capacity and type of oil to use.

lock pin

drag stake

drag stake

holder tube

lock pin

FIGURE 4

M6 bolts

tine shield

FIGURE 5

FIGURE 6

lock pin attached correctly

lock pin attached incorrectly

Advertising