Echelon Mini EVK User Manual
Page 89
Advertising

using an I/O button, press and hold the SW1 – SW4 I/O button on the evaluation
board running the MGDemo application when accepting or confirming an
connection, then press and release the related SW5 – SW8 Connect button on the
evaluation board being added to the connection, and then release the original I/O
button again.
Mini EVK User’s Guide
83
Advertising