7 fire installation – Glow-worm BBU 54/4 User Manual

Page 20

Advertising
background image

20

2000225024C

7 Fire Installation

Fire Front Installation and Servicing Instructions are packed
with the fire.

7.1 Completion - After Installation of the Fire

Front

Instruct and demonstrate to the user, the efficient and safe
operation of the boiler, heating and hot water system and fire
front.

Hand the Instructions for Use to the user, making sure that they
are understood.

Advise the user that to ensure the continued efficient and safe
operation of the appliance it is recommended that it is checked
and serviced as necessary at regular intervals. The frequency
of the servicing will depend upon the particular installation
conditions and usage, but in general once a year should be
enough.

Draw attention, if applicable, to the current issue of the Gas
Safety (Installation and Use) Regulations, Section 35, which
imposes a duty of care on all persons who let out any property
containing a gas appliance.

It is the law that any servicing must be carried out by a
competent person.

Set any remote controls for the system to settings requested by
the user.

Advise that the boiler is fitted with a flue blockage safety device
and refer to the Instructions for Use.

Advise the user of the importance to keep any purpose built
ventilation system where the appliance is installed, clear of any
obstruction that would impede its efficiency.

Reminder, leave these instructions with the user.

Advise the user that the ‘Benchmark’ logbook should be
completed by the installation engineer on completion of
commissioning or servicing.

Advertising