1 General

Diagram 1.5

9625

FULLY PUMPED SYSTEM
(DIAGRAMMATIC)

Diagram 1.4

PUMPED HEATING & GRAVITY DOMESTIC HOT
WATER (DIAGRAMMATIC)

9624

HEATING
SYSTEM

PUMP

28mm

1m MIN.
27m MAX.

INDIRECT
CYLINDER

15mm COLD FEED

22mm VENT

1.7 Hot Water Cylinder

The back boiler is suitable for open vented systems using an
indirect cylinder. The cylinder must be fitted to the manufacturer’s
recommendations and the system must conform to the
requirements of the current issue of BS5449.

It is recommended that the cylinder be fitted with some form of
temperature control.

1.8 Frost Protection

If the position of the boiler is such that it may be vulnerable to
freezing it should be protected as specified in the current issue
of BS5422.

It is also recommended that a frost thermostat is fitted.

1.9 Draining Tap

System

A draining tap must be provided at the lowest point of the
system which will allow the entire system, the boiler and hot
water cylinder to be drained.

Draining taps shall be to the current issue of BS2879.

Boiler

A draining point is fitted at the bottom of the side of the heat
exchanger where the water connections are located, see
diagram 1.1.

When draining is required cover the controls to avoid water
damage.

1.10 Safety Valve

A safety valve need not be fitted to an open vented system.

1.11 Boiler Location

This back boiler unit MUST NOT be installed in a private garage
or in a room containing a bath or shower or a room used or
intended to be used as sleeping accommodation.

1.12 Sealed Water System

A kit and instructions, part number 2000463000, is available to
enable the back boiler to be used on a sealed water system.

Please give the serial number of the back boiler when ordering
the kit.

1.13 Inhibitor

Attention is drawn to the current issue BS5499 and BS7593 on
the use of inhibitors in central heating systems.

If an inhibitor is to be used, contact a mnufacturer for their
recommendations as to the best product to use.

If using in an existing system take special care to drain the
entire system, including the radiators, then thoroughly cleaning
out before fitting the boiler whether or not adding an inhibitor.

The COLD FEED PIPE may be connected to flow
pipe, adjacent to the open vent pipe as shown.
(THERE MUST ALWAYS BE A COLD WATER
PATH TO THE RETURN CONNECTION OF THE
BOILER)

22mm