Installation – Glow-worm Clearly Heat Pump 5 kW User Manual

Page 14

Advertising
background image

0020111744_00 - 09/10 - Glow-worm

- 12 -

INSTALLATION

7.2

Recommendations before installing

Installation pipework must be designed and installed to ensure
venting of air from the system is possible.

b

Ensure that the water fl ow rate of the water circuit
corresponds to the nominal water fl ow rate of the
appliance (see ¨Technical data¨ chapter).

• Install the following components on the rear section of the

heat pump
- a fi lter,
- a ¼ shut –off valve on each side of the fi lter,
- a drain valve,
- an air separator (if necessary)
- a sludge deposit (if necessary).

• Install a ¼ turn shutoff valve in the fl ow of the heat pump.

i

In order to avoid the transmission of vibrations to
surrounding structures, use hoses for the hydraulic
connections at least 1 metre from the heat pump.

b

Insulate the pipes with a UV- and
hightemperature- resistant insulation.

7.3 Dimensions

390

345

880

171

171

538

37

898

350

935

7.4 Mounting

7.4.1

Unpacking the appliance

• Carefully remove the packaging and protections without

damaging the parts of the appliance.

1

2

3

Key
1 Transport

pallet

2 Attachment

screws

3 Heat

pump

• Remove the screws from the transport pallet at the front and

rear of the unit.

7.4.2

Transportation of the appliance

i

With regards to the Manual Handling Operations,
1992 Regulations, the following lift operation
exceeds the recommended weight for a one man lift.

a

Warning! Two people at minimum are necessary
to move the appliance.

Advertising