Glow-worm Energysaver Combi 80-100 User Manual

Page 17

Advertising
background image

17

221564F

Boiler Fixing

Having previously secured the wall mounting jig and hanging
bracket to the wall, lift the boiler into position in the following
manner. To assist in the lifting of the boiler, remove the casing
door.

Lean the top of the boiler slightly to the wall and position just
above the hanging bracket. Allow the boiler to slowly move
downwards until engaged in the hanging bracket.

Slowly swing the base of the boiler to the wall mounting jig
ensuring that the copper tails on the boiler fit into the gas and
water isolation valves on the jig, see diagram 8.1. If necessary
the gas and water isolation valve clamps can be loosened to
ease fitting. Make sure that the isolation valves are secured
with the clamps after making good the connections.

Connect the two electrical connector plugs hanging from the
boiler into the sockets on the wall mounting jig. The white mains
electrical supply socket on the left hand side of the jig and the
black auxiliary electrical socket on the right hand side of the jig.

NOTE: Please refer to condensate connection before
proceeding, see section 9.4.

Attach the flue as described in section 7.6.

BOILER
MOUNTING
FRAME

GAS
ISOLATION
VALVE

Diagram 8.1

CENTRAL
HEATING
RETURN

DOMESTIC
HOT
WATER
OUT

CENTRAL
HEATING
FLOW

DOMESTIC
COLD
WATER
SUPPLY IN

6512

DRAIN
POINT

DRAIN
POINT

GAS
SERVICE
COCK

ALL SLOTS SHOWN IN
CLOSED POSITION

CLAMP

SECURING

SCREW

PRESSURE RELIEF
VALVE PIPE

GAS & WATER ISOLATION VALVES

8 Boiler Fixing

9 Gas, Water, and Condensate Connections

9.1 Gas Connection

The gas supply can be connected from below or through the
wall at the rear of the boiler, the position is shown on the wall
template.

Refer also to section 1.2.

Make the gas supply connection to the gas isolation valve.
Slacken or remove the clamp, as desired, whilst making the
connection. Do not subject the gas isolation valve to heat, see
diagram 8.1.

9.2 Water Connections

Provision is made for the water connections to be made from
below or through an internal wall at the rear of the boiler, the
position is shown on the wall template. Copper tail pieces are
supplied in the wall mounting pack if required.

Flush out the domestic hot water and the heating systems
before connecting to the boiler.

Make the connections to the domestic hot water and heating
systems by way of the isolating valves, see diagram 8.1

Slacken or remove the clamps, as desired, while making the
connections. Do not subject any of the isolating valves to heat.

DOMESTIC
WATER
VALVES

CENTRAL
HEATING
VALVES

DRAIN
POINT TO
FRONT OF
APPLIANCE

Advertising