5 Electrical Wiring

5.4 Testing - Electrical

Checks to ensure electrical safety must be carried out by a
competent person.

After installation of the system, preliminary electrical system
checks as below should be carried out,

1. Test insulation resistance to earth

of mains cable.

2. Test the earth continuity and short

circuit of all cables.

3. Test the polarity of the mains.

5.5 Control Box Refitting

Refit the control box making sure that the control thermostat
capillary is positioned so that it passes through the cutout in the
control box panel, see diagram 5.2.

Secure with screw previously removed, see diagram 5.2.

Refit the gas valve electrical plug.

5.6 Control Thermostat Phial

Unwind the capillary so that it will be well clear of any part of the
back boiler which becomes hot and insert it fully into the pocket,
see diagram 5.6.

Secure with location washer behind the split pin.

If the phial pocket is on the right hand side use the cable clips
supplied in the fittings pack. Secure the capillary, see diagram
5.1. Check that the capillary is not touching any hot surfaces.

Diagram 5.5

Diagram 5.6

1870

8021

PHIAL
POCKET

RETAINING
SPLIT PIN

LOCATION
WASHER

CONTROL
BOX

FLOOR
PROTECTION
PLATE

CONTROL
THERMOSTAT
CAPILLARY

8082

Diagram 5.4

N

L

E

N

GAS VALVE

BLUE

BLACK

E

N

THERMOSTAT

NC

C

BROWN

BLACK

VIEW OF PLUG
WHEN REMOVED

GREEN/YELLOW

230V ~ 50Hz

MAINS SUPPLY

FUSED AT 3 AMP

GREEN/
YELLOW

L

Ls

Advertising