LPG MODELS - ONLY

Refer to diagram 2 and turn the gas valve throttle

fully clockwise, then turn the throttle anti-clockwise by the

number of turns shown in the table on the back page.

Please refer to the specific instruction relating to your

model.

1. Turn on the electrical supply.

2. Ensure external controls are calling for heat.

3. Turn on the gas supply.

4. Turn on the appliance.

5. The boiler should fire automatically.

NOTE: LPG MODELS

If the appliance does not light & goes to lockout (F1), turn

the throttle anti-clockwise 1 full turn. Reset the appliance.

The appliance will (after a short delay) again attempt to

fire. If necessary, repeat this procedure up to a total of 2

extra turns on the throttle screw, until the appliance lights.

Several ignition attempts may be needed, to purge gas

through the appliance, before a successful ignition is

achieved.

ALL MODELS

With the appliance cold.

Connect a CO2 combustion analyser to the appropriate

test point, see diagrams 1.

Maximum Rate Check and Adjustment

Refer to the instructions supplied with your appliance and set the

maximum rate.

Check and adjust CO2 as necessary.

NOTE: Adjustment is made by turning the throttle an

⅛ of a turn, waiting 1 minute to allow the appliance

to stabilise before checking or making further

adjustments.

● Rotate the “throttle”(anti-clockwise to increase), to the

required CO2, refer to diagram 2 and the “SETTING”

column in the table.

● Now proceed to check the minimum rate adjustment.

Set appliance to minimum rate.

Minimum Rate Check and Adjustment

Refer to the instructions supplied with your appliance and set the

minimum rate.

Check and adjust CO2 as necessary.

Adjustment is made by turning the offset adjustment, see

diagram 2.

If adjustment is necessary, proceed as follows:

NOTE: Adjustment of the CO2 at minimum rate is very

coarse and should not be adjusted more than an ⅛ of

a turn at a time. Wait 1 minute to allow the appliance

to stabilise before checking or making further

adjustments.

● Gradually rotate the “offset adjustment” (anti-clockwise

to decrease) to the required CO2, refer to diagram 2 and

the “SETTING” column in the table.

Re-Check CO2 and check the CO/CO2

combustion ratio.

● Re-check the maximum and minimum CO2 values to

ensure that they are within the “setting” limits in the table

then check the CO/CO2 combustion ratio does not exceed

the value in the CO/CO2 column of the table. If the CO/

CO2 setting exceeds the value in the table, a complete

servicing of the appliance will be necessary, refer to the

servicing instructions

Check the Gas Inlet Pressure and Gas Rate

On completion, test the gas installation for tightness using

the pressure drop method and suitable leak detection fluid,

purge in accordance with the above standard.

NOTE: Due to the modulating operation of the boiler and

the need to check the gas inlet pressure and measure the

gas rate at maximum rate, it will be necessary to force it to

maximum.

Operational Gas Inlet Pressure

With ALL other gas appliances operating, check the

operational supply pressure at the gas service isolation

valve test point, refer to your Installation literature supplied

with your appliance.

The nominal supply pressure for Natural Gas (G20) is

20mbar.

The nominal supply pressure for LPG (G31) is 37mbar.

Turn the taps and appliances off, then disconnect the

pressure gauge.

Additionally the safe nominal maximum heat input of the

appliance can be achieved at an inlet pressure down to

15mbar.

NOTE: The BURNER PRESSURE cannot be measured

and is not used to measure the gas rate.

Gas Rate

Make sure that ALL other gas burning appliances and pilot

lights are off.

Check the gas rate using the gas meter test dial and stop

watch, at least 10 minutes after the burner has lit, see

table below for approximate rates.

In communal or LPG installations where the gas rate

cannot be measured it is acceptable to measure the

combustion rate as described in the servicing section.

On completion, reset the boiler to normal operation by

referring to the Installation and Servicing Instructions.

Completion

If it is not possible to achieve the required results for

either the combustion or gas rates, it will be necessary to

complete a full service of the appliance and then repeat

the combustion check procedure. If after servicing and

adjustment of the appliance the combustion values are still

unacceptable and after further remedial work has been

carried out, the appliance must be disconnected until the

CO/CO2 ratio is acceptable. Advice can be sought from

the Glow-worm Technical Helpline.