4 installation, Fitting the injector, Method b – Glow-worm Inset BBU50 User Manual

Page 10: Method a

Advertising
background image

10

221723B

4 Installation

Diagram 4.4

FITTING THE
INJECTOR

22mm CENTRAL
HEATING RETURN

28mm DOMESTIC HOT
WATER FLOW

(Must rise to allow air to
escape from the system)

22mm CENTRAL
HEATING FLOW

Note: If the tee piece is
fitted away from the
boiler, the central
heating flow pipe must
be increased to 28mm
as shown.

28mm DOMESTIC
HOT WATER
RETURN

28mm
COPPER
PIPE

22mm
CENTRAL
HEATING
RETURN

28mm
DOMESTIC
HOT WATER
FLOW

28mm
DOMESTIC
HOT
WATER
RETURN

22mm COPPER
PIPE SUPPLIED
WITH APPLIANCE

(Do not cut)

METHOD B

22mm CENTRAL
HEATING FLOW

(Must run down
to allow air in
system to
escape)

22mm COPPER
PIPE SUPPLIED
WITH APPLIANCE

(Do not cut)

FIXED
DIMENSION

FIXED
DIMENSION

22mm COPPER
PIPE SUPPLIED
WITH APPLIANCE

(Do not cut)

22mm COPPER PIPE
SUPPLIED WITH
APPLIANCE

(Do not cut)

METHOD A

8027

8026

8025

INJECTOR
(Supplied)

22mm CENTRAL
HEATING RETURN

FIXED
DIMENSION

22mm COPPER PIPE
SUPPLIED WITH
APPLIANCE

(Do not cut)

UNEQUAL TEE
(supplied)

22mm

28mm

A

A

SECTION A-A

6763

BRAZED
JOINT

RETURN PIPE
ASSEMBLY

22mm
COPPER PIPE
SUPPLIED
WITH
APPLIANCE

(Do not cut)

Advertising