Hapter, Aintaining, Nclosure – Labconco Purifie Non-Ventilated PCR & Tissue Culture Enclosures 3952420 User Manual

Page 18

Advertising
background image

Product Service 1-800-522-7658

14








C

HAPTER

6

M

AINTAINING

Y

OUR

E

NCLOSURE


Now that you have an understanding of how to work in the non-ventilated
enclosure, we will review the suggested maintenance schedule and common
service operations.

Routine Maintenance Schedule


Weekly

• Clean the enclosure interior appropriate for the application.


Monthly (or more often as required)

• Using a cloth and glass cleaner, clean the exterior surfaces of the non-

ventilated enclosure, particularly the front to remove any accumulated dust.

• All weekly activities.


Annually

• Replace the UV lamp.

• Verify proper operation of the UV panel safety switch

• All monthly activities.

UV Light Replacement

1. Disconnect power.
2. Locate the UV lamp inside.
3. Rotate and remove the old UV lamp.
4. Reinstall the new UV lamp.
5. Switch unit on and try the new UV lamp (UV Closure Panel must be

installed).

Advertising