Operator Functions • 3

3-9

SV40221 Rev. C

For a C fold Job: Load the

Sheet Feeders from the

top feeder downwards, in

sequence (prime sheet in top

feeder).
Load Sheets Face Up and Top

First.

For a Sngle fold job: Load the

Sheet Feeders from the bottom

feeder upwards, in sequence

(prime sheet in bottom feeder).
Load Sheets Face Down and

Bottom First.

Loading Insert Feeder(s)

If either or both Insert Feeders are loaded with material when

SwiftStart is selected, the machine will feed the Inserts and make

them part of the SwiftStart™ job.
For a single Insert, load Insert Feeder F. For two Inserts, load Insert

Feeders F and G.
Booklets must be loaded into Insert Feeder F only and should be

loaded with the binding edge first.
Pre-folded Inserts should be fed with the open edge last.
Reply Envelopes (BRE’s) must be loaded flap side down, flap first.

Loading Envelope Feeder

Envelopes are loaded into Envelope

Feeder E flap side up, flap last.