RAVE Sports Rope Swing Freestanding Package User Manual

Page 9

Advertising
background image

8

Tip: Place pin into mount so the tether line is coming
straight out at you. This will orient the holes in the
pin for easy clip insertion in the bottom of the pin.
Insert clips onto pins, ensuring both ends of the clip
are securely inserted into the holes on both sides of
the pin.

Step 3: Inflation
See inflation and valve operation on p. 6.
Inflate base tube until very firm then inflate the platform until also firm.

Step 4: Assemble frame
Lay out frame components as shown.

Refer to diagram on next page and
note final orientation of frame pieces.

Insert both pieces of section B into the
ends of section A. Orient so the short
legs are pointing upwards and angled
slightly towards each other. Insert
bolts and hand tighten only at this time.

Insert frame pieces C into the other
end of section B. Insert bolts and hand
tighten.

Insert frame pieces D into the other
ends of C. Insert bolts and hand tighten. At this time, frame pieces
A, B, C & D should all be laying flat on the ground.

Insert frame pieces E into the angled, short ends of section B. Insert
bolts and hand tighten. Lastly, insert frame pieces F into the ends of
section E. Insert bolts and hand tighten.

A

B

C

D

E

F

G

Advertising
This manual is related to the following products: