Hi-6tr – Vortech 1993-1996 5.2L Grand Cherokee User Manual

Page 20

Advertising
background image

14

(–) TERM GROUND

C

RANE

cams

®

HI-6TR

CAPACITIVE DISCHARGE IGNITION

WITH AUTO-SEQUENCE REV LIMITER

(+) TERM

V

ACUUM

RESER

VOIR

FRAME RAIL

FRONT OF VEHICLE

(VIEW FROM TOP)

FUSE BOX

PASSENGER SIDE ENGINE COMPARTMENT

13. IGNITION/BOOST CONTROL INSTALLATION

A. Mount the ignition box in the engine

compartment onto the flat area near
the fuse box and passenger side
headlight. Use the supplied #10
sheet metal screws to secure. (See
graphic.)

B. Route the heavy black cable to a

clean ground. Route the heavy red
cable to the (+) positive terminal
located on the front side of the
under hood fuse box.

C. Locate the ignition coil plug-in

connector (grey and green wires)
on the vehicle wiring harness near
the original spring tensioner
location. Cut the connector from
the harness leaving 2-3" of wire
remaining on the connector.

D. Extend the wires on the coil

connector using the supplied grey and green wires. Connect
the grey and green extensions to the black and orange
wires from the ignition box. Connect the remaining wires
following the diagram on the following page.

E. Mount the timing retard control knob and the map sensor in

the drivers compartment underneath the dash. The knob
control must be in an accessible position from the drivers seat.

F. Attach one end of the supplied 5/32" vacuum line to the map

sensor. Route the red and blue (or brown) wires along with
the vacuum line through the firewall.

G. Connect vacuum line and wiring harness following graphic

on the next page.

NOTE: 1996-1997 models
have a slightly different coil
plug location and do not need
wire extensions.

Advertising