Pd1 & 2 - projector drop mechanism – Future Automation PD User Manual

Page 14

Advertising
background image

In

st

al

la

ti

o

n

:

R

S

23

2

an

d

O

pe

ra

tio

n

D

et

ai

ls

Page 13 of 18 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565

PD1 & 2 - Projector Drop Mechanism

Operation Details

DC1
A low voltage connection for the up
stop switch in the mechanism. This
must be re-connected if you extend
the cables. When the up switch is
hit, the connection between CC1
and ground is broken, the LED goes
off and the projector drop stops
going up.

AC1
Gives an output of 240V
(or 110V) to control the
Projector drop motor.
AC2
Outputs stay live for 120
seconds after the OUT or
IN functions are selected.

EMERGENCY STOP
This connection will stop all
functions of the mechanism once
broken / removed. This is where we
recommend wiring a safety device -
For a range of safety devices see
control, safety & accessories section
in product brochure.

DC1 - Up Delay
Link CC3 to 0V to delay the
projector carriage going in by
3 mins, allowing the projector
to cool.























SLQV

RS232
- Use an RJ25 connector
in the socket marked
RS232 on the control box
to operate using RS232

Details
Baud rate: 9600
Stop bit:

1

Parity:

None

Databits:

8

Pin 1: RX

Pin 6 : TX

Pin 3 & 4: GROUND

Pin 2: TX

Pin 3: RX

Pin 5: GROUND

IMPORTANT
Ensure protocol is entered exactly
as written, including Carriage Return
(Enter / ASCII 13).

RJ25

9 PIN D

PIN 1: RX

TO

PIN 2: TX

PIN 6: TX

TO

PIN 3: RX

PIN 3: GROUND

TO

PIN 5: GROUND

PIN 4: GROUND

TO

PIN 5: GROUND

Protocol

Action

fa_in Carriage Return (Enter )

Device IN

fa_out Carriage Return (Enter )

Device OUT

fa_stop Carriage Return (Enter )

Device STOP (At any position)

Advertising