Ph2 - projector hinge – Future Automation PH User Manual

Page 8

Advertising
background image

In

st

al

la

ti

o

n

:

S

ta

ge

3

Page 7 of 20 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565

PH2 - Projector Hinge

Installation of the mechanism into the wall

-ORGANISE THE CABLES READY TO
THREAD THROUGH THE CABLE HOLES
ON THE SIDE OF THE PRODUCT!
-Secure into internally out into the
joist frame work
-Check the mechanism and movement

Holes for cables to
be threaded through.

Run cables for the projector and the
mechanism through joist frame work
and mechanism access holes.

Make sure to remove
the 2 internal covers.

Insert cassette body into
the joist frame work. Make
sure the mechanism is in
the down position so you
can get to the internal fixing
holes.

Advertising