Ph2 - projector hinge – Future Automation PH User Manual
Page 9
Advertising

In
st
all
at
io
n
: S
ta
ge
4
Page 8 of 20 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
PH2 - Projector Hinge
Cable Management & Cladding
Thread cables through access
holes in the mechanism.
Secure the mechanism in place
from the inside using the fixing
holes in the sides and back.
After product is secured
replace the internal covers
back into the mechanism.
Cable Management Clips
Cable Access Holes
Fixing Holes
Finish cladding around the
aperture parameter, either
with plaster board or MDF
strips in an existing wall.
Remember you may have to
access the mechanism for
future servicing.
Cladding
Front Panel
Advertising