Ph2 - projector hinge – Future Automation PH User Manual

Page 9

Advertising
background image

In

st

all

at

io

n

: S

ta

ge

4

Page 8 of 20 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565

PH2 - Projector Hinge

Cable Management & Cladding

Thread cables through access
holes in the mechanism.

Secure the mechanism in place
from the inside using the fixing
holes in the sides and back.

After product is secured
replace the internal covers
back into the mechanism.

Cable Management Clips

Cable Access Holes

Fixing Holes

Finish cladding around the
aperture parameter, either
with plaster board or MDF
strips in an existing wall.
Remember you may have to
access the mechanism for
future servicing.

Cladding

Front Panel

Advertising