Installation instructions, Aht10 transition kit installation, Preparing the aht10 for installation – Dacor MH30 User Manual

Page 18: Installing the aht10 transition

Advertising
background image

16

AHT10 Transition Kit Installation

On dual exhaust models, the two 8” exhausts may be

merged into one 10” duct using Dacor transition kit AHT10.

Install the transition before installing the hood on the wall. It

connects to the hood on the top or rear, depending on the

type of installation.

Preparing the AHT10 for Installation

Prepare the transition for installation by bending the bot-

tom edges at right angles to create a ¾” flange around the

base.

iMportAnt: On 12” high hoods modified to exhaust

out the rear, leave one of the long edges unbent.

Drill pilot holes around the edges of the mounting flange

including the unmodified edge, if the transition will be

mounted to the back of a 12” high hood (see above).

Installing the AHT10 Transition:

top exhaust models and 18” high models with

rear exhaust:

Center the transition

over the duct collars

and fasten it in place

using sheet metal

screws (not included).

Seal the base of the

transition with duct

tape.

Route the wiring harness as shown. Secure the har-

11.

ness to the motor assemblies using the cable clamps

supplied with the hood in the positions shown below.
Attach the wiring harness to the brace inside the hood,

12.

on the right side using two (2) supplied cable ties.
Use a cable tie to take up any remaining slack that may

13.

exist in the wiring harness. Stow the harness behind

the plate on the right side. Securing any slack will

reduce additional noise due to vibration.

Tip the hood back down so that the top of the hood

14.

faces up. Using existing screws, attach the cover plates

removed in step 3 to the top of the hood to cover the

holes.
Attach the duct collars removed in step 2 to the back of

15.

the unit using the existing screws.

Installation Instructions

Cable

Clamps

Wiring

Harness

Cable

Ties

Cable tie if

necessary

iMportAnt: For proper

operation, route and secure

the harness exactly as shown.

transition flange prep:

All models using top

exhaust and 18” high

models with rear exhaust

transition flange prep:

12” high models with rear

exhaust

Leave this edge unmodified,

bend up other three.

Top mounting

shown

Advertising