Delivery, Introduction, Installation of sewing machine – Beisler 739-23-1 Installation Manual User Manual

Page 3

Advertising
background image

1. Delivery

The scope of delivery depends on your order.

Prior to installation, please check whether all required parts have been
supplied.

Equipment:

1 yarn stand

2 sewing machine head

3 operating panel

4 sewing lamp (optional)

5 material clamp support

6 material clamp (optional)

7 waste bin with suction control

8 drawer

Separately packed small
components

2. Introduction

CAUTION!

The sewing machine must be installed by suitably trained specialised
personnel.

Work at electrical components must be carried out by electricians or
other suitably trained staff.
Prior to such work, always discconect unit from the power supply.

Always comply with the instructions given by the manufacturer of the
step motors in the enclosed operating manual.

3. Installation of sewing machine

3.1

Removing of transport packaging

Remove transport packaging and securing devices at the sewing
machine head.

2-3

Advertising