Venting installation, Continued – Desa CHDV34(N/P)(A) User Manual

Page 10

Advertising
background image

10

105456

DIRECT-VENT FIREPLACE (NATURAL/PROPANE)

CHDV34(N/P)(A)

VENTING
INSTALLATION

Continued

UP

UP

Horizontal Venting

Vertical (V)

Horizontal (H)

37" min.

10" max.

Figure 16 - Horizontal Termination
Configuration for Rigid Venting

Figure 17 - Horizontal Termination Configuration for Rigid Venting Using One
90

°

Elbow

Figure 18 - Horizontal Termination Using Flexible Venting

Horizontal Venting

Vertical (V)

Horizontal (H)

44" min.

29" max.

(30

°

and 90

°

only, no vertical pipe)

55" min.

41" max.

(30

°

elbow, 1' vertical pipe, 90

°

elbow)

67" min.

60" max.

79" min.

84" max.

96" min.

20' max.

Note: This configuration for use with
corner installation.

UP

Horizontal Venting

See information in
Figures 16 and 17 for
Vertical(V) and
Horizontal(H) maxi-
mums and minimums.
The same amounts
apply for flexible
venting.

CBGFVK Vent Kit
Shown (recommended
for use with cabinet
mantel)

CBVK Vent Kit Shown

Horizontal Termination
Configurations

Figures 16 through 20 show different con-
figurations for venting with horizontal ter-
mination. Each figure includes a chart with
vertical minimum/maximum and horizon-
tal maximum dimensions which must be
met. All connections must be sealed with
high temperature silicone sealant as speci-
fied in the second warning statement on
page 7. All horizontal terminations require
1/4" rise per 12" of horizontal run.

Advertising