Installation Instructions

Recessed Concrete / Wood Floor Installation

1. Locate desired location of fixture prior to pouring concrete floor. Note: Rough-in for 510 is 4

1

/

2

” (114mm) Ø and

520 is 6

3

/

8

x 9

1

/

2

” (162mm x 241mm)

2. Prior to pouring concrete floor, insert knock out in location minimum 6” x 6” (510) and 6” x 14” (520) to provide
flexibility and room for hot and cold water supply line hook up. Note: finish floor material will cover oversized
opening.
3. Depth of rough in opening should be min 2”–2

1

/

2

” (51-64mm) to finished floor. Note: please allow for finish floor

material thickness.

4. Place rough-in assembly over desired location and make marks for the placement of the mounting screws.
5. Drill a

1

/

2

(12mm) pilot hole for each mounting screw.

6. Concrete floors—Insert threaded mounting

screw, with the provided anchor attached, into each of the three pilot

holes so that the threading on each screw is facing upwards.

7. Wood floors

—The rough-in is to be secured by lag bolts (not provided), as per install diagram.

8. Place the rough-in assembly onto the screws in the floor and adjust the small brass screws around the valve until

it is level.

9. Place a metal washer, followed by a locking washer onto the threaded part of each screw sticking above the

rough-in.

10. Tighten the rough-in into place by tightening a locking nut onto each screw over the metal washers.
11. Attach the water supply to the rough-in assembly by connecting the hot water supply on the left and the cold

water supply on the right.

12. Test the rough in connection for leaks prior to floor finish.
13. Tile the area surrounding the valve, leaving open a hole with a diameter of 75 - 90mm (3 - 31⁄2”).
14. Remove the protective plate from the top of the rough-in valve, exposing the water outlets.
15. Insert the main fixture body into the rough-in so that the supply lines plug into the water outlets.
16. Securely tighten the large brass nut at the base of the fixture body. Insert the extension tightening rod

provided into the hole in the fastening nut and thread onto the rough in turning in a clock wise direction until
secure.

17. Slide the escutcheon down so that it rests against the floor and completely covers the brass nut.
18. Connect one end of the shower hose to the hose attachment underneath the shower hook, and the other end

to the base of the hand-held shower head.

19. Push the spout into place on top of the mixer body and tighten the set screw using the provided Allen wrench.
20. Attach the horizontal control rod to the appropriate height on the connector.
21. Once everything is installed then test the fixture and make sure there are no leaks.

Technical Support Assistance

If further assistance is required, please contact:

Product Support at 1.866.907.0122 (09:00 – 17:00hrs PST) or email [email protected]

North America
Blu Bathworks Inc.
3614 East 1st Ave,Vancouver, BC, Canada, V5M 1C3
T +1.604.299.0122 F +1.604.299.0125

Blu Bathworks Inc.
188 Smithe St, Vancouver, BC, Canada, V6B 6A9
T +1.604.299.0122 F +1.604.299.0125

Advertising
This manual is related to the following products: