Blu Bathworks TSP510 User Manual

Page 5

Advertising
background image

2014-02

1 866 907 0122 blubathworks.com

5

5

Provide a hole

in the finished floor

of 2 1/2" - 3 1/8"

(ø65~ø80)

4

3

Cold

Hot

5

Test the level

Adjust all leveling

screws to ensure rough-in

is securely fastened and level

prior to floor finishing and

mounting fixture body.

27

7

8

1

2

6

60

Two outlets

3-Ø12

Hot

inlet

When installing the rough-in valve into or

on top of the floor, ensure both the location

and orientation properly relate to the bathtub.
1. If mounting the rough-in onto finished floor surface the rough-in

will be visually exposed. A second escutcheon cover plate is required.
2. If mounting the fixture on wood floor construction additional solid

blocking is required to secure and mount the rough-in.

Refer to diagram.

Test the tap for water

pressure, and check for

leaks prior to proceeding

to next steps.

Edge of bath tub

Cold

inlet

Drill 3x1/2" (12mm)

holes for anchor bolts

for concrete install

Depth of rough-in

from finished floor.

2"-2 1/2" (50-60)

• Securely fasten rough-in

into or on top of floor

surface
• Connect hot and cold

water lines into rough-in

inlets
• Check rough-in to

ensure it is level

Leveling screws

Rough-in Ø 4 1/2"

Ø 4 1/2"

5

6

Insert the main body

into the floor rough-in,

tighten the nut using the

tightening extension bar

by inserting it into the holes

in the side of the fastening

nut. When the body is secured

place the escutcheon . Cover

plate over the floor opening.

7

8

10

11

Install the spout,

shower hose and

shower, and test.

9

Provide a hole

in the finished floor

of 2 1/2" - 3 1/8"

(ø65~ø80)

4

3

Cold

Hot

5

Test the level

Adjust all leveling

screws to ensure rough-in

is securely fastened and level

prior to floor finishing and

mounting fixture body.

27

7

8

1

2

6

60

Two outlets

3-Ø12

Hot

inlet

When installing the rough-in valve into or

on top of the floor, ensure both the location

and orientation properly relate to the bathtub.
1. If mounting the rough-in onto finished floor surface the rough-in

will be visually exposed. A second escutcheon cover plate is required.
2. If mounting the fixture on wood floor construction additional solid

blocking is required to secure and mount the rough-in.

Refer to diagram.

Test the tap for water

pressure, and check for

leaks prior to proceeding

to next steps.

Edge of bath tub

Cold

inlet

Drill 3x1/2" (12mm)

holes for anchor bolts

for concrete install

Depth of rough-in

from finished floor.

2"-2 1/2" (50-60)

• Securely fasten rough-in

into or on top of floor

surface
• Connect hot and cold

water lines into rough-in

inlets
• Check rough-in to

ensure it is level

Leveling screws

Rough-in Ø 4 1/2"

Ø 4 1/2"

5

6

Insert the main body

into the floor rough-in,

tighten the nut using the

tightening extension bar

by inserting it into the holes

in the side of the fastening

nut. When the body is secured

place the escutcheon . Cover

plate over the floor opening.

7

8

10

11

Install the spout,

shower hose and

shower, and test.

9

2

3

Advertising
This manual is related to the following products: