Rough in installation, Connect cold inlet connect hot inlet – Blu Bathworks TSP210 User Manual

Page 3

Advertising
background image

2014-01

1 866 907 0122 blubathworks.com

®

2

Rough In Installation

TSP210 (Refer to illustration 1)
TSU220 (Refer to illustration 2)

Note: Rough-in depth for these products are provided on the protective mud guards.

1. Run

1

2

" (12.5mm) hot and cold supply lines. The spread between supplies is 1½" for TSP210 & 8" for TSU220

on center and is NOT adjustable.

2. Install a

1

2

” (12.5mm) sweat x

1

2

” (12.5mm) female IPS adapter onto each supply line.

3. Verify the supplies are secure, level, at the proper spread and equal depths.

4. Connect the rough-in to the water system, hot water connected on the left and cold water connected on the

right.

5. Align and level the faucet rough-in and secure the faucet rough-in into the wall.

6. Verify the supplies and faucet body are secure, then turn on the supplies and check for leaks.

1

FOR TSP210

Connect cold

inlet

Connect hot

inlet

1

2

3

4

5

6

1

2

Hot

inlet

1

2

Cold

inlet

Connect cold

inlet

Connect hot

inlet

1

2

3

4

5

6

1

2

Hot

inlet

1

2

Cold

inlet

Advertising
This manual is related to the following products: